Explore the Tasmanian project pipeline

Filters

RegionChevron down

Region

SectorChevron down

Sector

Project statusChevron down

Project Status

HeadcountChevron down

Headcount

0
3000+
ValueChevron down

Value ($millions)

0
650+
SORTSort icon
Highway Safety and Freight Efficiency Upgrades Package - Future Priorities

Sector: CIVIL

Status: CONCEPT

Project Value: $100 M

Headcount: 388

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

Channel Highway - Algona Road Grade Separated Interchange and Duplication of Kingston Bypass

Sector: CIVIL

Status: CONCEPT

Project Value: $60 M

Headcount: 270

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Northern Roads Package - Frankford Road, Birralee Road and Batman upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $55 M

Headcount: 213

Timeframe: Mar 2021 - Dec 2025

Ownership: PUBLIC

Great Eastern Drive Tourism Support

Sector: CIVIL

Status: CONCEPT

Project Value: $125 M

Headcount: 485

Timeframe: Mar 2023 - Dec 2029

Ownership: PUBLIC

Hobart to Sorell Corridor - Hobart Airport to Sorell Southern Bypass

Sector: CIVIL

Status: APPROVAL

Project Value: $70 M

Headcount: 271

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Bridport Road Freight and Safety Upgrades

Sector: CIVIL

Status: CONCEPT

Project Value: $20 M

Headcount: 78

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Huon Link Road

Sector: CIVIL

Status: TENDER

Project Value: $20 M

Headcount: 78

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Illawarra Road Upgrade Stage 2

Sector: CIVIL

Status: APPROVAL

Project Value: $65 M

Headcount: 252

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Illawarra Road Upgrade, Stage 1 Tannery Road to Bishopbourne Road

Sector: CIVIL

Status: COMMENCED

Project Value: $10 M

Headcount: 39

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Mornington Traffic Solution

Sector: CIVIL

Status: CONCEPT

Project Value: $30 M

Headcount: 116

Timeframe: Mar 2026 - Dec 2028

Ownership: PUBLIC

Heavy Vehicle Rest Area - Westbury

Sector: CIVIL

Status: CONCEPT

Project Value: $12 M

Headcount: 47

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Bass Highway Upgrade - Marrawah to Wynyard (ROSI)

Sector: CIVIL

Status: COMMENCED

Project Value: $96 M

Headcount: 372

Timeframe: Mar 2021 - Dec 2025

Ownership: PUBLIC

Bass Highway - Cooee to Wynyard - Cam River Bridge and Murchison Junction Upgrade

Sector: CIVIL

Status: COMMENCED

Project Value: $31 M

Headcount: 120

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Southern Outlet transit lane

Sector: CIVIL

Status: APPROVAL

Project Value: $35 M

Headcount: 158

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Rokeby Road, South Arm Upgrades

Sector: CIVIL

Status: APPROVAL

Project Value: $55 M

Headcount: 248

Timeframe: Mar 2025 - Dec 2027

Ownership: PUBLIC

Heavy Vehicle Rest Area Program

Sector: CIVIL

Status: CONCEPT

Project Value: $5 M

Headcount: 19

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Huonville Link Road

Sector: CIVIL

Status: APPROVAL

Project Value: $15 M

Headcount: 58

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Roads and Bridges Asset renewal 22/23FY

Sector: CIVIL

Status: APPROVAL

Project Value: $11 M

Headcount: 50

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

McVilly Drive City Connector (Stage 2) "Port to Clover Leaf"

Sector: CIVIL

Status: CONCEPT

Project Value: $18 M

Headcount: 81

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

North Huon Road upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $11 M

Headcount: 43

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Walking Track - Huonville to Franklin

Sector: CIVIL

Status: CONCEPT

Project Value: $17 M

Headcount: 66

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Mountain River Road upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $9 M

Headcount: 35

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Dip Road Upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $7 M

Headcount: 27

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Kingston Beach master plan implementation

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 23

Timeframe: Mar 2026 - Dec 2028

Ownership: PUBLIC

Kingston Park development

Sector: CIVIL

Status: CONCEPT

Project Value: $5 M

Headcount: 23

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

SpringFarm Connector Road plus improvements to Kingston View Drive

Sector: CIVIL

Status: APPROVAL

Project Value: $14 M

Headcount: 63

Timeframe: Mar 2031 - Dec 2033

Ownership: PUBLIC

Kingston CBD carparking

Sector: CIVIL

Status: APPROVAL

Project Value: $20 M

Headcount: 90

Timeframe: Mar 2031 - Dec 2033

Ownership: PUBLIC

Kingston to Margate shared path

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 23

Timeframe: Mar 2031 - Dec 2033

Ownership: PUBLIC

West Coast Reseal Program

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 19

Timeframe: Mar 2022 - Dec 2030

Ownership: PUBLIC

Footpath Reconstruction program

Sector: CIVIL

Status: APPROVAL

Project Value: $10 M

Headcount: 38

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Road reconstruction program

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 32

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Road reseal program

Sector: CIVIL

Status: APPROVAL

Project Value: $36 M

Headcount: 140

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Kerb Renewal program

Sector: CIVIL

Status: APPROVAL

Project Value: $10 M

Headcount: 37

Timeframe: Mar 2027 - Dec 2032

Ownership: PUBLIC

City Heart Project

Sector: CIVIL

Status: APPROVAL

Project Value: $20 M

Headcount: 78

Timeframe: Mar 2025 - Dec 2027

Ownership: PUBLIC

Residential Growth Areas Infrastructure (St Leonards)

Sector: CIVIL

Status: CONCEPT

Project Value: $9 M

Headcount: 35

Timeframe: Mar 2024 - Dec 2029

Ownership: PUBLIC

Residential Growth Areas Infrastructure (South Prospect)

Sector: CIVIL

Status: CONCEPT

Project Value: $23 M

Headcount: 89

Timeframe: Mar 2025 - Dec 2032

Ownership: PUBLIC

Campbell Town Streetscape and Safety Project: Bridge Street to the Esplanade

Sector: CIVIL

Status: CONCEPT

Project Value: $13 M

Headcount: 50

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Midland Highway Ross

Sector: CIVIL

Status: COMMENCED

Project Value: $47 M

Headcount: 182

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Midland Highway - Oatlands

Sector: CIVIL

Status: COMMENCED

Project Value: $56 M

Headcount: 217

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Lyell Highway, Queenstown to Strahan Safety Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $19 M

Headcount: 74

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

Midland Highway, North of Campbell Town

Sector: CIVIL

Status: COMMENCED

Project Value: $54 M

Headcount: 209

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Murchison Highway, Stitt River Bridge to Zeehan Highway, Henty Main Road

Sector: CIVIL

Status: APPROVAL

Project Value: $20 M

Headcount: 78

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Bass Highway - Leith Intersection Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $15 M

Headcount: 58

Timeframe: Mar 2023 - Dec 2023

Ownership: PUBLIC

Tasman Bridge upgrades

Sector: CIVIL

Status: APPROVAL

Project Value: $130 M

Headcount: 585

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

New Bridgewater Bridge

Sector: CIVIL

Status: COMMENCED

Project Value: $786 M

Headcount: 3539

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

New Park and Ride Facilities

Sector: CIVIL

Status: APPROVAL

Project Value: $20 M

Headcount: 78

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

New Tamar Crossing at University Way

Sector: CIVIL

Status: APPROVAL

Project Value: $400 M

Headcount: 1551

Timeframe: Mar 2026 - Dec 2030

Ownership: PUBLIC

Northern Suburbs Transit Corridor

Sector: CIVIL

Status: CONCEPT

Project Value: $38 M

Headcount: 173

Timeframe: Mar 2027 - Dec 2029

Ownership: PUBLIC

Otis Project - Tasman ITS

Sector: CIVIL

Status: APPROVAL

Project Value: $23 M

Headcount: 104

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Tasman Highway, Midway Point and Sorell Causeways

Sector: CIVIL

Status: APPROVAL

Project Value: $187 M

Headcount: 842

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Old Surrey Road/Massey Greene Drive Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $20 M

Headcount: 78

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Tasman Highway, Sideling upgrade Stage 1

Sector: CIVIL

Status: TENDER

Project Value: $50 M

Headcount: 194

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Tasman Highway, Sideling Stage 2

Sector: CIVIL

Status: CONCEPT

Project Value: $70 M

Headcount: 271

Timeframe: Mar 2025 - Dec 2029

Ownership: PUBLIC

Bass Highway, Deloraine to Latrobe

Sector: CIVIL

Status: CONCEPT

Project Value: $50 M

Headcount: 194

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

West Tamar Highway, Targeted upgrades between Exeter and Launceston

Sector: CIVIL

Status: CONCEPT

Project Value: $20 M

Headcount: 78

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Stanley Highway Tourism Upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $10 M

Headcount: 39

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

Northern Roads Package - Stage 2 - inc. East and West Tamar

Sector: CIVIL

Status: APPROVAL

Project Value: $420 M

Headcount: 1629

Timeframe: Mar 2027 - Dec 2033

Ownership: PUBLIC

Domain Highway/Brooker Highway interchange upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $150 M

Headcount: 675

Timeframe: Mar 2029 - Dec 2034

Ownership: PUBLIC

Devonport to Cradle Mountain Upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $25 M

Headcount: 97

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Arthur Highway Upgrades

Sector: CIVIL

Status: CONCEPT

Project Value: $50 M

Headcount: 225

Timeframe: Mar 2024 - Dec 2029

Ownership: PUBLIC

Charles Street Bridge

Sector: CIVIL

Status: APPROVAL

Project Value: $33 M

Headcount: 128

Timeframe: Mar 2029 - Dec 2031

Ownership: PUBLIC

Tarraleah Headworks and Conveyance Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $126 M

Headcount: 524

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Irrigation renewable energy projects

Sector: CIVIL

Status: APPROVAL

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

District Infrastructure Scheme (DIS)

Sector: CIVIL

Status: TENDER

Project Value: $21 M

Headcount: 87

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Jim’s Plains Wind Farm

Sector: CIVIL

Status: CONCEPT

Project Value: $350 M

Headcount: 1455

Timeframe: Mar 2026 - Dec 2036

Ownership: PUBLIC

Robbins Island Wind Farm

Sector: CIVIL

Status: CONCEPT

Project Value: $1600 M

Headcount: 6650

Timeframe: Mar 2026 - Dec 2036

Ownership: PUBLIC

220 kV live tank breakers

Sector: CIVIL

Status: COMMENCED

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Bushfire mitigation -assets

Sector: CIVIL

Status: COMMENCED

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Murchison Dam Upgrade - Phase 2 - Spill Way

Sector: CIVIL

Status: TENDER

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Transmission Line Protection

Sector: CIVIL

Status: COMMENCED

Project Value: $16 M

Headcount: 67

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Transmission Line Rep Program

Sector: CIVIL

Status: COMMENCED

Project Value: $76 M

Headcount: 316

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Transformer Protection

Sector: CIVIL

Status: COMMENCED

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

High voltage Substation Protection

Sector: CIVIL

Status: COMMENCED

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Low Voltage switchboards in ground mounted substations

Sector: CIVIL

Status: APPROVAL

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

Generic asset refurbishment

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

110 kV live tank breakers

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 33

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Replace ground mounted transformers

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2033

Ownership: PUBLIC

Threatened bird species fatality mitigation

Sector: CIVIL

Status: COMMENCED

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Public lighting assets

Sector: CIVIL

Status: COMMENCED

Project Value: $26 M

Headcount: 108

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

New and replacement of low voltage servicing assets

Sector: CIVIL

Status: COMMENCED

Project Value: $47 M

Headcount: 195

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Bruny Island Cable replacement

Sector: CIVIL

Status: COMMENCED

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2023 - Dec 2028

Ownership: PUBLIC

Sheffield network TXFR replacement

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2028

Ownership: PUBLIC

George Town - Temco line replacement

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2028

Ownership: PUBLIC

Waddamana Network transformer

Sector: CIVIL

Status: APPROVAL

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2023 - Dec 2028

Ownership: PUBLIC

West Coast supply reliability

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2028

Ownership: PUBLIC

Rosebery transformer replacements T1, T2

Sector: CIVIL

Status: APPROVAL

Project Value: $9 M

Headcount: 37

Timeframe: Mar 2023 - Dec 2028

Ownership: PUBLIC

Project Marinus - Marinus Link

Sector: CIVIL

Status: TENDER

Project Value: $3500 M

Headcount: 14548

Timeframe: Mar 2025 - Dec 2031

Ownership: PUBLIC

Stand alone power supplies

Sector: CIVIL

Status: COMMENCED

Project Value: $40 M

Headcount: 166

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Distribution Network:Customer Initiated works

Sector: CIVIL

Status: COMMENCED

Project Value: $30 M

Headcount: 125

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

High voltage overhead network program

Sector: CIVIL

Status: COMMENCED

Project Value: $200 M

Headcount: 831

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Ground mounted substations

Sector: CIVIL

Status: COMMENCED

Project Value: $21 M

Headcount: 87

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Telecommunications

Sector: CIVIL

Status: COMMENCED

Project Value: $19 M

Headcount: 79

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

High and low voltage underground cable program

Sector: CIVIL

Status: COMMENCED

Project Value: $17 M

Headcount: 71

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

High voltage switchgear in ground mounted substations

Sector: CIVIL

Status: COMMENCED

Project Value: $12 M

Headcount: 50

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Innovations and equipment trials

Sector: CIVIL

Status: COMMENCED

Project Value: $13 M

Headcount: 54

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

SCADA system renewal

Sector: CIVIL

Status: COMMENCED

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

IT (including Business Management System)

Sector: CIVIL

Status: COMMENCED

Project Value: $290 M

Headcount: 1205

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Facilities

Sector: CIVIL

Status: COMMENCED

Project Value: $22 M

Headcount: 91

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Fleet Replacement

Sector: CIVIL

Status: COMMENCED

Project Value: $45 M

Headcount: 187

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Telecommunications- Telephony systems

Sector: CIVIL

Status: COMMENCED

Project Value: $8 M

Headcount: 33

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Distribution network power quality improvement

Sector: CIVIL

Status: COMMENCED

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Distribution network reliability improvement

Sector: CIVIL

Status: COMMENCED

Project Value: $19 M

Headcount: 79

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Telecommunications- Bearers

Sector: CIVIL

Status: COMMENCED

Project Value: $16 M

Headcount: 67

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Telecommunications- MUX

Sector: CIVIL

Status: COMMENCED

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Lake Echo Power Station - Refurbishment

Sector: CIVIL

Status: COMMENCED

Project Value: $29 M

Headcount: 121

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Catagunya Power Station Machine No. 2 - Refurbishment

Sector: CIVIL

Status: COMMENCED

Project Value: $19 M

Headcount: 79

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Trevallyn Power Station Machine No.4 Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2026 - Dec 2027

Ownership: PUBLIC

Trevallyn Power Station Machine No. 1 - Refurbishment

Sector: CIVIL

Status: COMMENCED

Project Value: $15 M

Headcount: 62

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Meadowbank Dam Crest Gates Controls Replacement

Sector: CIVIL

Status: TENDER

Project Value: $11 M

Headcount: 46

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Energy Control System Refresh

Sector: CIVIL

Status: COMMENCED

Project Value: $15 M

Headcount: 62

Timeframe: Mar 2022 - Dec 2034

Ownership: PUBLIC

Poatina Penstock External Painting

Sector: CIVIL

Status: APPROVAL

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Arthurs Lake Pump - Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $23 M

Headcount: 96

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Edgar Dam Repairs

Sector: CIVIL

Status: CONCEPT

Project Value: $18 M

Headcount: 75

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Lemonthyme Power Station Refurbishment

Sector: CIVIL

Status: TENDER

Project Value: $33 M

Headcount: 137

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Rowallan Power Station - Refurbishment

Sector: CIVIL

Status: TENDER

Project Value: $27 M

Headcount: 112

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Poatina Power Station Machine No. 3 - Upgrade

Sector: CIVIL

Status: TENDER

Project Value: $9 M

Headcount: 37

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Gordon 1 & 3 Main Inlet Valve Replacements

Sector: CIVIL

Status: CONCEPT

Project Value: $12 M

Headcount: 50

Timeframe: Mar 2025 - Dec 2029

Ownership: PUBLIC

Boyer Substation - T13 & T14

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

Poatina Power Station Machine No. 2 - Upgrade

Sector: CIVIL

Status: TENDER

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2025 - Dec 2025

Ownership: PUBLIC

Tungatinah Power Station Machine No. 3 - Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $14 M

Headcount: 58

Timeframe: Mar 2030 - Dec 2031

Ownership: PUBLIC

Gordon Power Station Machine No.2 - Runner Replacement

Sector: CIVIL

Status: TENDER

Project Value: $15 M

Headcount: 62

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Poatina Power Station Machine No.1 - Alternator & Secondary Systems Upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $9 M

Headcount: 37

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Trevallyn Power Station Machine No.3 Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $11 M

Headcount: 46

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Mackintosh Power Station Refurbishment

Sector: CIVIL

Status: TENDER

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Mackintosh Power Station - Refurbishment

Sector: CIVIL

Status: APPROVAL

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2026 - Dec 2027

Ownership: PUBLIC

220 kV switches

Sector: CIVIL

Status: COMMENCED

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Bastyan Power Station - Refurbishment

Sector: CIVIL

Status: TENDER

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2026 - Dec 2027

Ownership: PUBLIC

110 kV switches

Sector: CIVIL

Status: COMMENCED

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2022 - Dec 2032

Ownership: PUBLIC

Trevallyn Power Station No. 4 Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2027 - Dec 2028

Ownership: PUBLIC

Poatina Power Station Machine No. 6 - Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $22 M

Headcount: 91

Timeframe: Mar 2027 - Dec 2028

Ownership: PUBLIC

110 kV dead tank circuit breakers

Sector: CIVIL

Status: COMMENCED

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Tungatinah Penstock Coating Programme

Sector: CIVIL

Status: CONCEPT

Project Value: $40 M

Headcount: 166

Timeframe: Mar 2030 - Dec 2035

Ownership: PUBLIC

John Butters Power Station Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2028 - Dec 2029

Ownership: PUBLIC

Reece Power Station Machine No. 2 - Refurbishment

Sector: CIVIL

Status: TENDER

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2029 - Dec 2030

Ownership: PUBLIC

Lemonthyme Penstock Painting

Sector: CIVIL

Status: CONCEPT

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2027 - Dec 2028

Ownership: PUBLIC

Fisher Penstock Coating Program External

Sector: CIVIL

Status: CONCEPT

Project Value: $9 M

Headcount: 37

Timeframe: Mar 2026 - Dec 2027

Ownership: PUBLIC

Tarraleah Redevelopment

Sector: CIVIL

Status: APPROVAL

Project Value: $700 M

Headcount: 2910

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Gordon Power Station Machine No.1 - Runner Replacement

Sector: CIVIL

Status: TENDER

Project Value: $26 M

Headcount: 108

Timeframe: Mar 2027 - Dec 2028

Ownership: PUBLIC

Tungatinah Power Station Stator Replacement Programme

Sector: CIVIL

Status: CONCEPT

Project Value: $24 M

Headcount: 100

Timeframe: Mar 2029 - Dec 2032

Ownership: PUBLIC

Hobart CBD 11kV supply

Sector: CIVIL

Status: APPROVAL

Project Value: $15 M

Headcount: 62

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Distribution overhead

Sector: CIVIL

Status: COMMENCED

Project Value: $14 M

Headcount: 58

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Distribution network ground mounted assets

Sector: CIVIL

Status: COMMENCED

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2032

Ownership: PUBLIC

Gordon Power Station Machine No. 3 - Turbine Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $21 M

Headcount: 87

Timeframe: Mar 2029 - Dec 2031

Ownership: PUBLIC

Tribute Power Station - Refurbishment

Sector: CIVIL

Status: CONCEPT

Project Value: $21 M

Headcount: 87

Timeframe: Mar 2030 - Dec 2031

Ownership: PUBLIC

Reece Power Station Machine No. 1 Refurbishment

Sector: CIVIL

Status: TENDER

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2027 - Dec 2028

Ownership: PUBLIC

Greater Meander Irrigation District (GMID) Augmentation

Sector: CIVIL

Status: APPROVAL

Project Value: $20 M

Headcount: 83

Timeframe: Mar 2023 - Dec 2023

Ownership: PUBLIC

Sassafras Wesley Vale Augmentation

Sector: CIVIL

Status: APPROVAL

Project Value: $12 M

Headcount: 52

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Don Irrigation Scheme

Sector: CIVIL

Status: COMMENCED

Project Value: $30 M

Headcount: 125

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Northern Midlands

Sector: CIVIL

Status: APPROVAL

Project Value: $207 M

Headcount: 860

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Tamar Irrigation Scheme

Sector: CIVIL

Status: APPROVAL

Project Value: $210 M

Headcount: 873

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

South East Integration Project

Sector: CIVIL

Status: APPROVAL

Project Value: $400 M

Headcount: 1663

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Southern Midland Irrigation Scheme

Sector: CIVIL

Status: APPROVAL

Project Value: $300 M

Headcount: 1247

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Patriarch and Sons Rotary Veneer Mill

Sector: CIVIL

Status: CONCEPT

Project Value: $54 M

Headcount: 224

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Dutch Mill Edith Creek milk processing facility

Sector: CIVIL

Status: COMMENCED

Project Value: $25 M

Headcount: 104

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Hermal Group (timber processing facility)

Sector: CIVIL

Status: CONCEPT

Project Value: $190 M

Headcount: 790

Timeframe: Mar 2026 - Dec 2036

Ownership: PUBLIC

FermenTasmania

Sector: CIVIL

Status: CONCEPT

Project Value: $16 M

Headcount: 67

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Tas Alkaloids

Sector: CIVIL

Status: CONCEPT

Project Value: $11 M

Headcount: 46

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Inghams Expansion

Sector: CIVIL

Status: CONCEPT

Project Value: $40 M

Headcount: 168

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Beach Street SW Upgrade

Sector: CIVIL

Status: TENDER

Project Value: $6 M

Headcount: 23

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

West Coast Stormwater Program

Sector: CIVIL

Status: CONCEPT

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Waterproofing the Gateway to Launceston Project: TRANSlink Precinct Stormwater Renewal Program

Sector: CIVIL

Status: CONCEPT

Project Value: $6 M

Headcount: 23

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Implementation of Stage 2 and 3 of the Sheepwash Creek WSUD Master Plan

Sector: CIVIL

Status: CONCEPT

Project Value: $6 M

Headcount: 26

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Port Arthur Historic Site Water Treatment Plant, Reserviour and Distribution Network Upgrades

Sector: CIVIL

Status: CONCEPT

Project Value: $35 M

Headcount: 145

Timeframe: Mar 2023 - Dec 2027

Ownership: PUBLIC

Port Arthur Historic Site Sewerage Treatment Plant

Sector: CIVIL

Status: CONCEPT

Project Value: $35 M

Headcount: 145

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Hobart CBD Main Sewer Alignment

Sector: CIVIL

Status: COMMENCED

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Freycinet Pensinsula Wastewater Project

Sector: CIVIL

Status: TENDER

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Davis St, Smithton Sewer Pump Station Upgrade

Sector: CIVIL

Status: TENDER

Project Value: $17 M

Headcount: 71

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Bryn Estyn WTP Major Upgrade

Sector: CIVIL

Status: COMMENCED

Project Value: $220 M

Headcount: 914

Timeframe: Mar 2020 - Dec 2023

Ownership: PUBLIC

Pet Dam Safety Upgrade

Sector: CIVIL

Status: TENDER

Project Value: $16 M

Headcount: 64

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Bicheno STP Recycled Water Scheme Expansion

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 31

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Launceston Sewer Improvement Plan

Sector: CIVIL

Status: CONCEPT

Project Value: $205 M

Headcount: 852

Timeframe: Mar 2025 - Dec 2031

Ownership: PUBLIC

Launceston Water Supply Surety

Sector: CIVIL

Status: CONCEPT

Project Value: $27 M

Headcount: 112

Timeframe: Mar 2024 - Dec 2024

Ownership: PUBLIC

Macquarie Point STP Relocation

Sector: CIVIL

Status: APPROVAL

Project Value: $60 M

Headcount: 249

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

North-West Water Supply Upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $139 M

Headcount: 578

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

Orford SPSs & Network Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $9 M

Headcount: 37

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Pardoe Sewer Improvement Plan

Sector: CIVIL

Status: CONCEPT

Project Value: $28 M

Headcount: 118

Timeframe: Mar 2027 - Dec 2029

Ownership: PUBLIC

Rosny Optimisation

Sector: CIVIL

Status: APPROVAL

Project Value: $6 M

Headcount: 23

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Ulverstone STP Upgrade

Sector: CIVIL

Status: TENDER

Project Value: $11 M

Headcount: 46

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Tamar Estuary Health Recovery Action Plan (TEHRAP)

Sector: CIVIL

Status: TENDER

Project Value: $129 M

Headcount: 536

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Regional Towns Water Supply Program Stage 4

Sector: CIVIL

Status: APPROVAL

Project Value: $56 M

Headcount: 233

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

UV Program Stage 2A (Burnie, Chimney Saddle, Distillery, Mt Leslie, West Tamar)

Sector: CIVIL

Status: TENDER

Project Value: $12 M

Headcount: 50

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

UV Program Stage 2B - Campbell Town/Ross, Fingal, Queenstown, South Esk, Swansea, Triabunna, Tullah, West Tamar and Zeehan

Sector: CIVIL

Status: TENDER

Project Value: $12 M

Headcount: 48

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Mt Leslie WTP Sludge Handling

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Burnie RC Trunk Main Renewal

Sector: CIVIL

Status: APPROVAL

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Stubbs Point and Johnson Beach SPS Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $10 M

Headcount: 39

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Lower Reservoir Dam Safety Upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2026 - Dec 2026

Ownership: PUBLIC

Flagstaff Gully Dam Risk Reduction Works

Sector: CIVIL

Status: CONCEPT

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Chimney Saddle Raw Water Storage

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 31

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Distillery Creek Raw Water Storage

Sector: CIVIL

Status: APPROVAL

Project Value: $18 M

Headcount: 73

Timeframe: Mar 2025 - Dec 2029

Ownership: PUBLIC

Cameron Bay STP - Odour Improvement Works

Sector: CIVIL

Status: APPROVAL

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Green Point STP – Biosolids Treatment and Handling Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $6 M

Headcount: 23

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Wynyard STP Upgrade

Sector: CIVIL

Status: CONCEPT

Project Value: $18 M

Headcount: 77

Timeframe: Mar 2026 - Dec 2027

Ownership: PUBLIC

Geeveston STP Outfall

Sector: CIVIL

Status: TENDER

Project Value: $9 M

Headcount: 37

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Cygnet STP Outfall

Sector: CIVIL

Status: TENDER

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Ridgeway Dam Safety Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $56 M

Headcount: 233

Timeframe: Mar 2025 - Dec 2027

Ownership: PPP

Bridport Water Surety

Sector: CIVIL

Status: APPROVAL

Project Value: $27 M

Headcount: 112

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

PittWater Sewerage Strategy

Sector: CIVIL

Status: APPROVAL

Project Value: $33 M

Headcount: 137

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Scottsdale STP Optimisation

Sector: CIVIL

Status: CONCEPT

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Fenton Major Upgrade/Replacement

Sector: CIVIL

Status: CONCEPT

Project Value: $102 M

Headcount: 424

Timeframe: Mar 2025 - Dec 2027

Ownership: PUBLIC

Hobart Sewerage Improvement Plan

Sector: CIVIL

Status: CONCEPT

Project Value: $176 M

Headcount: 732

Timeframe: Mar 2026 - Dec 2031

Ownership: PUBLIC

Queenstown Galvanised Water Main Upgrades

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 22

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Fern Tree Major WTP Upgrade / Replacement

Sector: CIVIL

Status: CONCEPT

Project Value: $60 M

Headcount: 249

Timeframe: Mar 2025 - Dec 2027

Ownership: PUBLIC

Tasman Highway, Orford – Trunk main

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Hobart Airport Upgrade

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $60 M

Headcount: 249

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Strahan Airport Upgrade

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Airfreight Cargo Facility

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Terminal Arrivals - Hall Expansion Project

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $6 M

Headcount: 23

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Airfield Lighting Upgrade - Runway

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $6 M

Headcount: 23

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Launceston Airport - Runway Overlay

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $15 M

Headcount: 62

Timeframe: Mar 2027 - Dec 2027

Ownership: PUBLIC

Aircraft Apron Expansion

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2027 - Dec 2027

Ownership: PUBLIC

Airfield Lighting Upgrade - Taxiways

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $6 M

Headcount: 23

Timeframe: Mar 2028 - Dec 2028

Ownership: PUBLIC

Airfield Road Upgrade

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $15 M

Headcount: 62

Timeframe: Mar 2027 - Dec 2028

Ownership: PUBLIC

Bell Bay Concrete Remediation - Berth 6

Sector: CIVIL

Status: COMMENCED

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2020 - Dec 2023

Ownership: PUBLIC

Bell Bay Berth Remedial Works

Sector: CIVIL

Status: COMMENCED

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Devonport East Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $240 M

Headcount: 998

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Macquarie Wharf Redevelopment

Sector: CIVIL

Status: APPROVAL

Project Value: $220 M

Headcount: 914

Timeframe: Mar 2026 - Dec 2031

Ownership: PUBLIC

Franklin Wharf Reconstruction & Development

Sector: CIVIL

Status: CONCEPT

Project Value: $49 M

Headcount: 204

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Selfs Point Fuel Fire Control System

Sector: CIVIL

Status: COMMENCED

Project Value: $9 M

Headcount: 37

Timeframe: Mar 2019 - Dec 2021

Ownership: PUBLIC

Mac 1 - 4 Concrete Remediation

Sector: CIVIL

Status: TENDER

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Burnie Chip Export Terminal Programme of works

Sector: CIVIL

Status: TENDER

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Bell Bay Renewables Hub

Sector: CIVIL

Status: CONCEPT

Project Value: $35 M

Headcount: 145

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Bell Bay Ship Loader Replacement

Sector: CIVIL

Status: APPROVAL

Project Value: $12 M

Headcount: 50

Timeframe: Mar 2022 - Dec 2025

Ownership: PRIVATE

Bell Bay Area 8 berth development

Sector: CIVIL

Status: CONCEPT

Project Value: $18 M

Headcount: 75

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Longreach South Wharf Remediation

Sector: CIVIL

Status: CONCEPT

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Burnie Export Gateway: Breakwater Infill and new dedicated berth

Sector: CIVIL

Status: CONCEPT

Project Value: $120 M

Headcount: 499

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Burnie Export Gateway: Berth 7 Capital Dredging

Sector: CIVIL

Status: CONCEPT

Project Value: $30 M

Headcount: 125

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Tasmanian Freight Rail Revitalisation Program: Tranche 3 Shiploader Replacement Project (Funded through IIP)

Sector: CIVIL

Status: COMMENCED

Project Value: $64 M

Headcount: 266

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Community Asset Regeneration North Ports

Sector: CIVIL

Status: CONCEPT

Project Value: $25 M

Headcount: 104

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

Cruise Terminal Precinct - Macquarie Wharf 2/3

Sector: CIVIL

Status: CONCEPT

Project Value: $45 M

Headcount: 187

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

Devonport Community Wharf

Sector: CIVIL

Status: CONCEPT

Project Value: $17 M

Headcount: 71

Timeframe: Mar 2024 - Dec 2027

Ownership: PRIVATE

Tasmanian Freight Rail Revitalisation Program: Tranche 2

Sector: CIVIL

Status: COMMENCED

Project Value: $120 M

Headcount: 541

Timeframe: Mar 2019 - Dec 2023

Ownership: PPP

Restoring Direct Rail Access to the Bell Bay Wharf

Sector: CIVIL

Status: APPROVAL

Project Value: $30 M

Headcount: 135

Timeframe: Mar 2025 - Dec 2027

Ownership: PPP

Legacy Locomotive Life Extension Project

Sector: CIVIL

Status: COMMENCED

Project Value: $15 M

Headcount: 68

Timeframe: Mar 2022 - Dec 2025

Ownership: PPP

Grade separation of high risk road/rail interfaces at Western Junction and Conara on the Midland Highway

Sector: CIVIL

Status: CONCEPT

Project Value: $70 M

Headcount: 315

Timeframe: Mar 2030 - Dec 2032

Ownership: PUBLIC

Melba Line Bulk Minerals Rail Hub

Sector: CIVIL

Status: APPROVAL

Project Value: $18 M

Headcount: 81

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Tasmanian Freight Rail Revitalisation Program: Tranche 4 (Funded through the IIP)

Sector: CIVIL

Status: APPROVAL

Project Value: $120 M

Headcount: 541

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

Rail Productivity Optimisation

Sector: CIVIL

Status: CONCEPT

Project Value: $80 M

Headcount: 361

Timeframe: Mar 2028 - Dec 2032

Ownership: PUBLIC

Network Renewals - Ongoing - Beyond Tranche 4

Sector: CIVIL

Status: CONCEPT

Project Value: $80 M

Headcount: 361

Timeframe: Mar 2028 - Dec 2032

Ownership: PUBLIC

Tasmanian Freight Rail Revitalisation Program: Tranche 3 Rail Renewal Project (Funded through the IIP)

Sector: CIVIL

Status: COMMENCED

Project Value: $96 M

Headcount: 433

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Launceston General Hospital Redevelopment - Stage 1

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $87 M

Headcount: 423

Timeframe: Mar 2021 - Dec 2022

Ownership: PUBLIC

Launceston General Hospital Redevelopment – Stage 2

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $500 M

Headcount: 2422

Timeframe: Mar 2025 - Dec 2031

Ownership: PUBLIC

Launceston General Hospital Redevelopment - Stage 2 - Mental Health Precinct

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $80 M

Headcount: 388

Timeframe: Mar 2026 - Dec 2027

Ownership: PUBLIC

North West Regional Hospital - Maternity Services

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $6 M

Headcount: 28

Timeframe: Mar 2021 - Dec 2022

Ownership: PUBLIC

Royal Hobart Hospital Pharmacy Redevelopment

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $6 M

Headcount: 32

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Peacock Centre and St John's Park - Extra Beds

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $21 M

Headcount: 112

Timeframe: Mar 2021 - Dec 2024

Ownership: PUBLIC

Health Transport and Coordination Infrastructure

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $9 M

Headcount: 45

Timeframe: Mar 2016 - Dec 2021

Ownership: PUBLIC

Human Resources Information System

Sector: COMMERCIAL

Status: TENDER

Project Value: $22 M

Headcount: 105

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Hospital Equipment Fund - Statewide

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $20 M

Headcount: 97

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Royal Hobart Hospital - New Angiography Suite and Equipment Upgrade

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $7 M

Headcount: 38

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Kingston Health Centre - Stage 2

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $30 M

Headcount: 162

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Royal Hobart Hospital Redevelopment - Expanded Stage 2 - A Block

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $110 M

Headcount: 533

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

North West Regional Hospital - Stage 1 - Mental Health Precinct

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $40 M

Headcount: 194

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

North West Regional Hospital Ward upgrades for new bed capacity

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $20 M

Headcount: 97

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Mersey Community Hospital - Expanded Redevelopment

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $20 M

Headcount: 97

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Ambulance Vehicles and Equipment

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $9 M

Headcount: 44

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Royal Hobart Hospital Redevelopment

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $469 M

Headcount: 2532

Timeframe: Mar 2012 - Dec 2022

Ownership: PUBLIC

Mersey Community Hospital Capital Upgrades

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $37 M

Headcount: 181

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

King Island Hospital Redevelopment - Stage 2

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $10 M

Headcount: 51

Timeframe: Mar 2021 - Dec 2021

Ownership: PUBLIC

Royal Hobart Hospital Redevelopment - Stage 2 - J Block

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $91 M

Headcount: 492

Timeframe: Mar 2021 - Dec 2026

Ownership: PUBLIC

Glenorchy Ambulance Super Station

Sector: COMMERCIAL

Status: TENDER

Project Value: $10 M

Headcount: 56

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

New Burnie Ambulance Station

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $10 M

Headcount: 50

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Rural Hospital and Ambulance Station Upgrades - Statewide

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $15 M

Headcount: 73

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Hospital Critical Facility Upgrades - Statewide

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $7 M

Headcount: 34

Timeframe: Mar 2017 - Dec 2023

Ownership: PUBLIC

Rural Hospital Equipment Boost

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $5 M

Headcount: 24

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

North West Regional Hospital - Acute Care facility

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $10 M

Headcount: 48

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Kings Meadows Community Centre

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $10 M

Headcount: 48

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

St Johns Park Eating Disorders Treatment Centre

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $10 M

Headcount: 54

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Regional Health and Ambulance Facilities Fund

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $10 M

Headcount: 48

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Nexus private hospital

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $80 M

Headcount: 388

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Calvary private northern hospital

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $100 M

Headcount: 484

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Year 7-12 Implementation Plan - Capital

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $10 M

Headcount: 50

Timeframe: Mar 2022 - Dec 2022

Ownership: PUBLIC

Capital Improvements - Year 7-12 Implementation Plan

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $10 M

Headcount: 50

Timeframe: Mar 2023 - Dec 2023

Ownership: PUBLIC

Renewable Energy Schools Program

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $5 M

Headcount: 24

Timeframe: Mar 2022 - Dec 2026

Ownership: PUBLIC

Supporting Safer Schools

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $6 M

Headcount: 31

Timeframe: Mar 2022 - Dec 2026

Ownership: PUBLIC

Support School Package including North West School

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $20 M

Headcount: 94

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Cambridge Primary School - Major School Redevelopment

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $15 M

Headcount: 71

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Hobart City High School

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $22 M

Headcount: 102

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Exeter High School - Major School Redevelopment

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $11 M

Headcount: 52

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Montello Primary School - Major School Redevelopment

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $7 M

Headcount: 33

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Outdoor Learning Program

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $10 M

Headcount: 47

Timeframe: Mar 2021 - Dec 2024

Ownership: PUBLIC

Electrical Switchboard Maintenance Program

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $8 M

Headcount: 38

Timeframe: Mar 2022 - Dec 2026

Ownership: PUBLIC

Lauderdale Primary School - Major School Redevelopment

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $6 M

Headcount: 31

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Health Hub Expansion - Alanvale

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $5 M

Headcount: 24

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Campus Upgrade and optimise equipment - Devonport and Burnie

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $5 M

Headcount: 24

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Campus upgrade and optimise equipment - Alanvale

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $5 M

Headcount: 24

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Agricultural Centre of Excellence

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $5 M

Headcount: 24

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Energy, Trades and Water Centre of Excellence

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $26 M

Headcount: 123

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

New K-12 Penguin School

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $20 M

Headcount: 94

Timeframe: Mar 2020 - Dec 2023

Ownership: PUBLIC

New K-12 Sorell School

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $26 M

Headcount: 123

Timeframe: Mar 2021 - Dec 2025

Ownership: PUBLIC

Six New Child and Family Learning Centres

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $28 M

Headcount: 132

Timeframe: Mar 2021 - Dec 2024

Ownership: PRIVATE

Revitalising Cosgrove High School

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $20 M

Headcount: 94

Timeframe: Mar 2023 - Dec 2025

Ownership: PRIVATE

Legana Primary

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $34 M

Headcount: 159

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

New Brighton High School

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $74 M

Headcount: 349

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Contemporary Classrooms

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $10 M

Headcount: 47

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Antarctic and Science Precinct (ASP)

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $450 M

Headcount: 2124

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

Antarctic and Science Precinct Enabling Works (Including Minor Remediation)

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $7 M

Headcount: 33

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

University of Tasmania city centric campus

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $500 M

Headcount: 2359

Timeframe: Mar 2026 - Dec 2033

Ownership: PUBLIC

University of Tasmania Launceston campus (Inveresk)

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $344 M

Headcount: 1624

Timeframe: Mar 2020 - Dec 2024

Ownership: PUBLIC

University of Tasmania Burnie campus (West Park)

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $51 M

Headcount: 241

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Large Vessel Replacement Program

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $24 M

Headcount: 100

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Police Housing Upgrade

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $22 M

Headcount: 91

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Ashley Youth Detention Centre

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2021 - Dec 2021

Ownership: PUBLIC

Northern Correctional Facility

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $270 M

Headcount: 1122

Timeframe: Mar 2025 - Dec 2031

Ownership: PUBLIC

Longford Police Station

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2021 - Dec 2022

Ownership: PUBLIC

New Norfolk Police Station

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $5 M

Headcount: 21

Timeframe: Mar 2021 - Dec 2022

Ownership: PUBLIC

Sorell Emergency Services Hub

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $12 M

Headcount: 50

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Southern Remand Centre Development

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $70 M

Headcount: 291

Timeframe: Mar 2020 - Dec 2022

Ownership: PUBLIC

Launceston Police Station

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $7 M

Headcount: 29

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Burnie Court Complex Development

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $40 M

Headcount: 166

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Risdon Prison - Shared Facilities Upgrade

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $10 M

Headcount: 39

Timeframe: Mar 2021 - Dec 2022

Ownership: PUBLIC

Risdon Prison - Electronic Security Services Lifecycle Replacement

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $12 M

Headcount: 50

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

New Maximum Security Unit

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2025 - Dec 2031

Ownership: PUBLIC

Project Unify

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $46 M

Headcount: 191

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

State Control Centre / State Operations Centre

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $6 M

Headcount: 27

Timeframe: Mar 2021 - Dec 2022

Ownership: PUBLIC

Risdon Prison - TPS Critical Infrastructure Upgrade

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2022 - Dec 2025

Ownership: PUBLIC

Risdon Prison - New Kitchen

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $15 M

Headcount: 62

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Bridgewater Police Station Upgrade

Sector: COMMERCIAL

Status: TENDER

Project Value: $12 M

Headcount: 52

Timeframe: Mar 2024 - Dec 2026

Ownership: PRIVATE

St Helens Police Station

Sector: COMMERCIAL

Status: TENDER

Project Value: $8 M

Headcount: 31

Timeframe: Mar 2024 - Dec 2026

Ownership: PRIVATE

Cradle Mountain Visitor Experience (Dove Lake Shelter)

Sector: CIVIL

Status: COMMENCED

Project Value: $26 M

Headcount: 120

Timeframe: Mar 2021 - Dec 2022

Ownership: PRIVATE

Community Recovery Fund - Parks Infrastructure (Fire Recovery Projects)

Sector: CIVIL

Status: COMMENCED

Project Value: $8 M

Headcount: 39

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Freycinet Tourism Icons (Commonwealth) Project

Sector: CIVIL

Status: TENDER

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2025 - Dec 2027

Ownership: PUBLIC

Indoor Multipurpose Sports Centre (Burnie)

Sector: CIVIL

Status: COMMENCED

Project Value: $15 M

Headcount: 69

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Next Iconic Walk Project

Sector: CIVIL

Status: TENDER

Project Value: $40 M

Headcount: 184

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

Harness and greyhound tracks for the North-West Coast (New)

Sector: CIVIL

Status: APPROVAL

Project Value: $18 M

Headcount: 83

Timeframe: Mar 2022 - Dec 2024

Ownership: PUBLIC

Wilkinsons Point Multisport Centre

Sector: CIVIL

Status: APPROVAL

Project Value: $50 M

Headcount: 229

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

UTAS Stadium Redevelopment Project

Sector: CIVIL

Status: APPROVAL

Project Value: $130 M

Headcount: 598

Timeframe: Mar 2024 - Dec 2026

Ownership: PUBLIC

Tasmania's New Arts, Entertainment and Sports Precinct

Sector: CIVIL

Status: CONCEPT

Project Value: $750 M

Headcount: 3452

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Dial Park Regional Complex upgrades

Sector: CIVIL

Status: CONCEPT

Project Value: $25 M

Headcount: 115

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

MyState Bank Arena

Sector: CIVIL

Status: COMMENCED

Project Value: $68 M

Headcount: 311

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Cradle Mountain Cableway

Sector: CIVIL

Status: APPROVAL

Project Value: $60 M

Headcount: 276

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Zero Emissions Bus Trials - Electric

Sector: CIVIL

Status: TENDER

Project Value: $6 M

Headcount: 28

Timeframe: Mar 2023 - Dec 2023

Ownership: PUBLIC

Zero Emissions Bus Trials - Hydrogen

Sector: CIVIL

Status: TENDER

Project Value: $11 M

Headcount: 52

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

TMAG Asset Maintenance Plan

Sector: CIVIL

Status: APPROVAL

Project Value: $40 M

Headcount: 184

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

Bus Replacement Program

Sector: CIVIL

Status: COMMENCED

Project Value: $13 M

Headcount: 59

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Freycinet New Visitor Gateway Project

Sector: CIVIL

Status: APPROVAL

Project Value: $14 M

Headcount: 64

Timeframe: Mar 2025 - Dec 2026

Ownership: PUBLIC

Maria Island Rediscovered Project - Stage 3

Sector: CIVIL

Status: APPROVAL

Project Value: $7 M

Headcount: 32

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Oaltlands Aquatic Centre

Sector: CIVIL

Status: COMMENCED

Project Value: $9 M

Headcount: 41

Timeframe: Mar 2020 - Dec 2022

Ownership: PUBLIC

Princess Theatre

Sector: CIVIL

Status: APPROVAL

Project Value: $12 M

Headcount: 55

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

Donne Kennedy Aquatic Centre Upgrade

Sector: CIVIL

Status: APPROVAL

Project Value: $10 M

Headcount: 46

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

Exeter Community Hub

Sector: CIVIL

Status: CONCEPT

Project Value: $6 M

Headcount: 28

Timeframe: Mar 2027 - Dec 2029

Ownership: PUBLIC

Legana Future Recreation developments

Sector: CIVIL

Status: CONCEPT

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2027 - Dec 2029

Ownership: PUBLIC

Riverside Swimming Centre

Sector: CIVIL

Status: CONCEPT

Project Value: $13 M

Headcount: 60

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

North West Museum and Art Gallery

Sector: CIVIL

Status: CONCEPT

Project Value: $18 M

Headcount: 83

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Coastal pathway - Fernglade to Heybridge - Eastern section

Sector: CIVIL

Status: APPROVAL

Project Value: $10 M

Headcount: 46

Timeframe: Mar 2027 - Dec 2029

Ownership: PUBLIC

Albert Hall Upgrade and Refurbishment

Sector: CIVIL

Status: COMMENCED

Project Value: $10 M

Headcount: 46

Timeframe: Mar 2021 - Dec 2024

Ownership: PUBLIC

Kingborough Sports Precinct improvements

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 37

Timeframe: Mar 2027 - Dec 2033

Ownership: PUBLIC

Northern Midlands Cycle/WalkWay Strategy implementation

Sector: CIVIL

Status: CONCEPT

Project Value: $10 M

Headcount: 44

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Scottsdale outdoor aquatic centre

Sector: CIVIL

Status: COMMENCED

Project Value: $8 M

Headcount: 35

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Pembroke Stadium - C-20-PemPark-Stadium

Sector: CIVIL

Status: COMMENCED

Project Value: $8 M

Headcount: 39

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Pembroke Park - Future Stages - Function Centre, NPL Soccer Pitch, Tennis Facility, Skatepark Extension, Playground

Sector: CIVIL

Status: CONCEPT

Project Value: $9 M

Headcount: 41

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Batten Park Equestrian Centre

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 23

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Slipstream Building (Circus Training and School)

Sector: CIVIL

Status: COMMENCED

Project Value: $6 M

Headcount: 28

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Coastal Pathway - Wynyard to Cooee

Sector: CIVIL

Status: COMMENCED

Project Value: $16 M

Headcount: 72

Timeframe: Mar 2023 - Dec 2025

Ownership: PUBLIC

Central Park & Civic Infrastructure (truth and reconcilation art park)

Sector: CIVIL

Status: APPROVAL

Project Value: $18 M

Headcount: 83

Timeframe: Mar 2026 - Dec 2028

Ownership: PUBLIC

The Goods Shed and Yard Redevelopment

Sector: CIVIL

Status: APPROVAL

Project Value: $5 M

Headcount: 23

Timeframe: Mar 2022 - Dec 2023

Ownership: PUBLIC

The Gateway Remediation (Audit Area 6)

Sector: CIVIL

Status: TENDER

Project Value: $18 M

Headcount: 83

Timeframe: Mar 2024 - Dec 2025

Ownership: PUBLIC

The Escarpment (Land and Development Opportunity)

Sector: CIVIL

Status: APPROVAL

Project Value: $78 M

Headcount: 359

Timeframe: Mar 2023 - Dec 2028

Ownership: PUBLIC

The District (Land and Development Opportunity)

Sector: CIVIL

Status: TENDER

Project Value: $350 M

Headcount: 1611

Timeframe: Mar 2024 - Dec 2028

Ownership: PUBLIC

Port Arthur Administration Centre

Sector: CIVIL

Status: CONCEPT

Project Value: $6 M

Headcount: 28

Timeframe: Mar 2023 - Dec 2024

Ownership: PUBLIC

Tamar Estuary (Infrastructure Upgrades)

Sector: CIVIL

Status: CONCEPT

Project Value: $145 M

Headcount: 667

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Stellar Resources Heemskirk Tin Project

Sector: CIVIL

Status: CONCEPT

Project Value: $110 M

Headcount: 506

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Forward Mining Rogetta iron ore mine

Sector: CIVIL

Status: CONCEPT

Project Value: $100 M

Headcount: 460

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Chambroad Kangaroo Bay Hotel and International Hospitality College

Sector: CIVIL

Status: CONCEPT

Project Value: $80 M

Headcount: 368

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

The Great Lake Hotel

Sector: CIVIL

Status: COMMENCED

Project Value: $200 M

Headcount: 920

Timeframe: Mar 2020 - Dec 2025

Ownership: PUBLIC

Arm End golf course

Sector: CIVIL

Status: CONCEPT

Project Value: $16 M

Headcount: 74

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Our Cradle (boutique accommodation)

Sector: CIVIL

Status: CONCEPT

Project Value: $20 M

Headcount: 92

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

Devonport Waterfront Hotel

Sector: CIVIL

Status: COMMENCED

Project Value: $40 M

Headcount: 184

Timeframe: Mar 2019 - Dec 2021

Ownership: PUBLIC

Devonport Living City – Waterfront Precinct

Sector: CIVIL

Status: COMMENCED

Project Value: $17 M

Headcount: 78

Timeframe: Mar 2019 - Dec 2022

Ownership: PUBLIC

MONA casino and hotel expansion (Berriedale)

Sector: CIVIL

Status: CONCEPT

Project Value: $380 M

Headcount: 1749

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

197 Macquarie Street Hotel

Sector: CIVIL

Status: COMMENCED

Project Value: $50 M

Headcount: 230

Timeframe: Mar 2021 - Dec 2023

Ownership: PUBLIC

Wilkinson’s Point Precinct & Derwent Entertainment Centre

Sector: CIVIL

Status: CONCEPT

Project Value: $300 M

Headcount: 1381

Timeframe: Mar 2025 - Dec 2028

Ownership: PUBLIC

Cape Wickham Golf Links - Accommodation

Sector: CIVIL

Status: APPROVAL

Project Value: $70 M

Headcount: 322

Timeframe: Mar 2026 - Dec 2029

Ownership: PUBLIC

Kingston Park project

Sector: CIVIL

Status: COMMENCED

Project Value: $300 M

Headcount: 1381

Timeframe: Mar 2020 - Dec 2028

Ownership: PUBLIC

Albert Hall redevelopment

Sector: CIVIL

Status: CONCEPT

Project Value: $12 M

Headcount: 55

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Launceston Creative Precinct

Sector: CIVIL

Status: APPROVAL

Project Value: $91 M

Headcount: 419

Timeframe: Mar 2024 - Dec 2027

Ownership: PUBLIC

GPH Hotel

Sector: CIVIL

Status: APPROVAL

Project Value: $50 M

Headcount: 230

Timeframe: Mar 2027 - Dec 2030

Ownership: PUBLIC

DADA gallery and carpark

Sector: CIVIL

Status: CONCEPT

Project Value: $19 M

Headcount: 87

Timeframe: Mar 2023 - Dec 2026

Ownership: PUBLIC

Callington Mill Whisky Distillery

Sector: CIVIL

Status: COMMENCED

Project Value: $20 M

Headcount: 92

Timeframe: Mar 2020 - Dec 2022

Ownership: PUBLIC

Federal Group Port Arthur Hotel

Sector: CIVIL

Status: CONCEPT

Project Value: $25 M

Headcount: 115

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

Remarkable Lodge

Sector: CIVIL

Status: CONCEPT

Project Value: $20 M

Headcount: 92

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

Recherche Bay Eco Resort

Sector: CIVIL

Status: CONCEPT

Project Value: $25 M

Headcount: 115

Timeframe: Mar 2027 - Dec 2030

Ownership: PRIVATE

Iron Creek Farm Stay (previously Orani)

Sector: CIVIL

Status: COMMENCED

Project Value: $14 M

Headcount: 64

Timeframe: Mar 2020 - Dec 2022

Ownership: PRIVATE

Bayport Group Spring Bay Project (Solis golf development)

Sector: CIVIL

Status: CONCEPT

Project Value: $45 M

Headcount: 207

Timeframe: Mar 2027 - Dec 2030

Ownership: PRIVATE

Table Cape Luxury Resort

Sector: CIVIL

Status: CONCEPT

Project Value: $70 M

Headcount: 322

Timeframe: Mar 2025 - Dec 2028

Ownership: PRIVATE

Ocean Dunes Golf Course

Sector: CIVIL

Status: CONCEPT

Project Value: $16 M

Headcount: 74

Timeframe: Mar 2027 - Dec 2030

Ownership: PRIVATE

125 Bathurst Street (Hotel incl Bar and Restaurant)

Sector: CIVIL

Status: CONCEPT

Project Value: $17 M

Headcount: 78

Timeframe: Mar 2024 - Dec 2027

Ownership: PRIVATE

Rosny Hill

Sector: CIVIL

Status: CONCEPT

Project Value: $50 M

Headcount: 230

Timeframe: Mar 2027 - Dec 2030

Ownership: PRIVATE

Villa Howden

Sector: CIVIL

Status: CONCEPT

Project Value: $10 M

Headcount: 46

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

79 Collins Street

Sector: CIVIL

Status: CONCEPT

Project Value: $22 M

Headcount: 101

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

Cambria Green

Sector: CIVIL

Status: CONCEPT

Project Value: $140 M

Headcount: 644

Timeframe: Mar 2024 - Dec 2027

Ownership: PRIVATE

Discovery Park

Sector: CIVIL

Status: COMMENCED

Project Value: $20 M

Headcount: 92

Timeframe: Mar 2021 - Dec 2023

Ownership: PRIVATE

Fragrance Towers Elizabeth Street

Sector: CIVIL

Status: CONCEPT

Project Value: $80 M

Headcount: 368

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

Gorge Hotel

Sector: CIVIL

Status: CONCEPT

Project Value: $50 M

Headcount: 230

Timeframe: Mar 2024 - Dec 2027

Ownership: PRIVATE

Montpelier Retreat Project

Sector: CIVIL

Status: CONCEPT

Project Value: $70 M

Headcount: 322

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

Piano Coves

Sector: CIVIL

Status: CONCEPT

Project Value: $50 M

Headcount: 230

Timeframe: Mar 2026 - Dec 2029

Ownership: PRIVATE

The Mills New Norfolk

Sector: CIVIL

Status: CONCEPT

Project Value: $8 M

Headcount: 37

Timeframe: Mar 2023 - Dec 2026

Ownership: PRIVATE

Argosy Hotel

Sector: CIVIL

Status: APPROVAL

Project Value: $8 M

Headcount: 37

Timeframe: Mar 2023 - Dec 2026

Ownership: PRIVATE

10-16 Wellington Street (formerly TasTAFE)

Sector: CIVIL

Status: CONCEPT

Project Value: $50 M

Headcount: 230

Timeframe: Mar 2023 - Dec 2026

Ownership: PRIVATE

TMAG Redevelopment

Sector: CIVIL

Status: CONCEPT

Project Value: $30 M

Headcount: 138

Timeframe: Mar 2023 - Dec 2026

Ownership: PRIVATE

Great Eastern Drive Mobile Coverage Program

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $11 M

Headcount: 46

Timeframe: Mar 2021 - Dec 2023

Ownership: PRIVATE

TasGRN - Tasmanian Government Radio Network

Sector: COMMERCIAL

Status: COMMENCED

Project Value: $750 M

Headcount: 3117

Timeframe: Mar 2021 - Dec 2024

Ownership: PRIVATE

Virtual Campus

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $10 M

Headcount: 42

Timeframe: Mar 2023 - Dec 2024

Ownership: PRIVATE

Optus - Mobile South Region - Mobile Macro and IBC Builds

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $14 M

Headcount: 60

Timeframe: Mar 2022 - Dec 2027

Ownership: PRIVATE

Optus - Mobile North Region - Mobile Macro and IBC Builds

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $13 M

Headcount: 54

Timeframe: Mar 2022 - Dec 2027

Ownership: PRIVATE

Optus - Mobile North West Region - Mobile Macro and Small Cell Builds

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $6 M

Headcount: 25

Timeframe: Mar 2022 - Dec 2027

Ownership: PRIVATE

Fingal Valley underground coal mine

Sector: CIVIL

Status: COMMENCED

Project Value: $50 M

Headcount: 208

Timeframe: Mar 2015 - Jun 2023

Ownership: PRIVATE

Renison Expansion Project - Area 5 tin mine, 15km northeast of Zeehan

Sector: CIVIL

Status: TENDER

Project Value: $55 M

Headcount: 229

Timeframe: Dec 2023 - Dec 2026

Ownership: PRIVATE

Hotel Lenna of Hobart expansion - a new 85-room, six-star boutique hotel on the existing car park site located at Battery Point

Sector: COMMERCIAL

Status: APPROVAL

Project Value: $60 M

Headcount: 249

Timeframe: Dec 2023 - Dec 2025

Ownership: PRIVATE

Low Head Wind Farm consisting of 9 to 12 wind turbine generators

Sector: CIVIL

Status: CONCEPT

Project Value: $60 M

Headcount: 249

Timeframe: Jun 2024 - Jun 2027

Ownership: PRIVATE

400-bed hotel at 28-30 Davey Street

Sector: COMMERCIAL

Status: CONCEPT

Project Value: $130 M

Headcount: 540

Timeframe: Jun 2024 - Jun 2026

Ownership: PRIVATE

Mount Lindsay tin and tungsten mine.

Sector: CIVIL

Status: APPROVAL

Project Value: $200 M

Headcount: 831

Timeframe: Dec 2024 - Jun 2027

Ownership: PRIVATE

Map legend